Summary

County environmental health and building staff told the applicant that jurisdictional wetlands need a 25-foot upland buffer, recreational land-use parcels in the 100-year floodplain require 60% open space, and platform elevations must meet the county floodplain ordinance (BFE+1-foot, NAVD 88). The DRC advised documenting base flood elevation and elevation data in the SEP.

Constance Lake of the building department told the applicant the parcel sits in a special flood-hazard area with a base flood elevation of 8 and that finished- and platform-elevation data should be shown in NAVD 88 on the site engineering plan. "...this is in a special flood hazard area with base flood elevation of 8," Lake said, and that the minimum elevation requirement for a platform would be BFE plus 1 foot, roughly 9 feet NAVD 88 for finished platforms.

Planning staff also noted an impervious-surface cap (50% maximum for the recreational land-use category), a required 25-foot upland buffer for jurisdictional wetlands under LDC section 37.03, and an additional open-space requirement (60%) for properties in the hundred-year floodplain. Staff asked applicants to reference the applicable LDC sections on their SEP and said a formal reviewer will evaluate compliance at submittal.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source