MassDOT Public Meeting: Discussion on Temporary Bridge Construction Hall Whitaker Bridge 10/08/2025
5952197 · October 9, 2025
An In-Person Public Information Meeting will be hosted by MassDOT at the location below to present the upcoming temporary bridge construction as part of the bridge replacement, B-11-001, Bridge Street over Bass River (Hall-Whitaker Drawbridge) project in Beverly, MA. Information on the permanent bridge design and updates on the replacement of the adjacent Kernwood Avenue Bridge (Beverly-Salem) will also be presented.
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.
No related articles available for this source.
