Citizen Portal
Sign In

Wells Select Board Meeting 12/8/25 at 5PM

Town of Wells workshop (fire substation facilities study) · December 9, 2025

A town workshop in Wells reviewed a draft facilities study proposing to expand the existing substation to house town EMS (WIMS/WEMS), add ambulance bays, bunk space and training/EOC space; estimated all‑in construction and site work is about $6 million with an urgent lease timeline that could require action by March 2027.

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.