BOCC Meeting
A Lewis County Flood Control Zone District briefing on a proposed flow-through flood retention facility for the Chehalis Basin, covering updated design changes, environmental mitigation, modeled benefits (including an estimated 62,000 acre-feet capacity and 2,600 structures potentially protected), cost and schedule estimates, and public comment/hearing dates for the revised draft EIS.
AI-Generated Content
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
No transcript available.
