Town of Newburgh Proposed Project and Needs for the Wastewater System Video
Town of Newburgh · November 6, 2025
Presenters briefed residents on a plan to build a 4,000,000‑gallon wastewater equalization tank and related headworks to reduce rain-driven plant overloads and protect local service for about 40,000 customers served by the Town of Newburgh utility.
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.
No related articles available for this source.
