Citizen Portal
Sign In

Hastings-on-Hudson Board of Education Meeting December 17, 2024

Hastings-on-Hudson Board of Education · December 19, 2024

Board of Education authorized an environmental review (SEQR/SEQRA) to analyze a proposed $45–46 million bond package that would add classroom space, relocate the high-school cafeteria and study athletic-field options (including up to two turf fields with lights). The vote starts the state review; it is not a final approval of a bond referendum.

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.