Rocky Flats Site, Colorado, Tour – 903 Pad

Rocky Flats site presentation · March 25, 2026

A site presenter described historical contamination at the former 903 Pad at Rocky Flats, cleanup actions taken (including removal of contaminated surface soil), ongoing groundwater and surface-water monitoring, and engineering controls such as the Stanley Lake protection/bypass project and erosion controls.

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.