Citizen Portal
Sign In

SSP Referendum- Facilities

Not specified · April 6, 2026

A staff member summarized a facility study and urged attention to unseen infrastructure needs — aging electrical systems, HVAC units and roofs — noting safety risks and potential energy savings from upgrades; no bond amount or timeline was specified.

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.