Design Option B 2.1 - MHS Building Project
Medford Public Schools · April 14, 2026
The Medford Public Schools building committee discussed a preferred "B1.2" renovation that would keep most of the existing high school structure, add roughly 120,000 square feet by building two stories over existing wings, and prioritize lowering embodied carbon by reusing materials.
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.
No related articles available for this source.
