Citizen Portal
Sign In

Village of Lake Bluff - ABR Special Design Workshop - May 28, 2026

Lake Bluff Board of Architecture Review · May 28, 2026

Lake Bluff Board of Architecture Review reviewed design options for the Green Bay Road bridge replacement, debated whether and how to reuse historic truss members, and narrowed design preferences for the required 10-foot railroad fence and a roadside exhibit to memorialize the old bridge.

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.