Citizen Portal
Sign In

Groundwater U 2024: DOE demonstrates in-situ pilot study at SSFL

Remediation demonstration · June 24, 2026

Presenters demonstrated a small-scale pilot for in-place groundwater treatment at the HMSA site, describing pump-and-treat and in situ amendment approaches for TCE contamination and saying the Department of Toxic Substances Control recently approved the pilot. The demonstration emphasized monitoring, pilot-scale spheres of influence (15 ft and 20 ft), and that full-scale design will depend on pilot results.

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.