Citizen Portal
Sign In

04.13.26_approved_mcep_public_meeting_minutes.pdf

Town of Plevna · April 13, 2026

At an April 13, 2026 public input meeting, Brosz Engineering presented a preliminary engineering report outlining two options to address failing clay-tile sanitary sewer lines in Plevna — full replacement or cured-in-place pipe (CIPP) lining — and said a construction funding application will be due May 19, 2026.

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.