Board approves Smith mobile home permit with 2‑ft elevation over base flood

Aug 19, 2026

The Planning Board approved FP 8-2026 allowing a replacement manufactured home on a 1.95-acre lot in AR zoning, with the chassis to be set 2 ft above the FEMA base flood elevation of 1,055 ft and anchorage and propane-tank security required.

The full story

The board approved Floodplain Development Permit FP 8-2026 for a 1.95-acre parcel where a new manufactured home will be set partly on an existing slab. Minutes note that most of the lot sits in FEMA 500‑year flood zone B, with a small area in the 100‑year flood zone A. Southern Tier Regional’s Janet Thigpen advised that a manufactured home in that location should have the bottom of the chassis set 2 ft above the base flood elevation. The FEMA FIRM panel lists the base flood elevation at 1,055 ft above sea level.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in