Board approves $3,500 to widen E3 Basin control structure opening

River Ridge Community Development District Board of Supervisors · March 24, 2026

Summary

The board approved MRI Construction Proposal #606 for $3,500 to widen the E3 Basin control-structure opening to maximize outflow; the district engineer will provide before-and-after photos and explore adding a manual gate.

The River Ridge board approved MRI Construction Proposal #606 on March 24 to widen the opening on the E3 Basin control structure to the maximum allowable width to improve outflow. The motion passed unanimously: "On MOTION by Mr. Blumenthal and seconded by Mr. Schultz, with all in favor, MRI Construction Proposal #606 to widen the opening on the E3 Basin Control Structure, in the amount of $3,500, was approved."

District Engineer Charlie Krebs described that the structure adjacent to the FPL easement is slightly shy of the maximum width and that the proposal calls for using a concrete saw to widen the weir. The board discussed whether a manual open/close gate could be installed; Krebs will provide before-and-after photographs and investigate installing a manual gate near the control structure.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source