Board approves $3,500 to widen E3 Basin control structure opening

Mar 24, 2026

The board approved MRI Construction Proposal #606 for $3,500 to widen the E3 Basin control-structure opening to maximize outflow; the district engineer will provide before-and-after photos and explore adding a manual gate.

The full story

The River Ridge board approved MRI Construction Proposal #606 on March 24 to widen the opening on the E3 Basin control structure to the maximum allowable width to improve outflow. The motion passed unanimously: "On MOTION by Mr. Blumenthal and seconded by Mr. Schultz, with all in favor, MRI Construction Proposal #606 to widen the opening on the E3 Basin Control Structure, in the amount of $3,500, was approved."

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in