Engineer says 125,000‑sq‑ft industrial building planned; board approves development plan

Sep 17, 2026

MLS Engineering presented plans for a 125,000‑square‑foot building on an 85‑acre site at 6610 County Road 60; the board approved the drainage and site plans after the engineer and surveyor described reshaping a pond, matching outlet flows, and installation of larger pipes under a new access road.

The full story

Bob Gaffer of MLS Engineering told the board the applicant intends to construct a 125,000‑square‑foot building on an 85‑acre property at 6610 County Road 60 in St. Joe. Gaffer said the existing detention feature north of the building was never intended as a detention pond but contains an isolation/control valve that can be shut to contain spills; the proposal calls for reshaping the pond, adding several 48‑inch high‑flow pipes beneath a proposed access road, and matching proposed outlet flows to existing flows.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in