Commission issues negative determinations for septic upgrade near Spectacle Pond

Sep 17, 2026

The commission granted Negative 3 and Negative 6 determinations for a Title 5 septic upgrade and MicroFAST treatment unit at 33 Newman Road, conditioned on removal of a brush pile; the proposal includes relocating a well to meet setbacks from Spectacle Pond.

The full story

At the Sept. 16 meeting the commission reviewed a request for determination to replace a failing cesspool at 33 Newman Road with a Title 5 sewage disposal system and a MicroFAST alternative treatment unit. Bridal Grady of GAF Engineering told the board the project is a routine septic upgrade required because the existing cesspool is too close to site wells; Grady said the cesspool will be filled, a new 1,500‑gallon pump chamber installed and the leach field located to meet setback distances from Spectacle Pond and an adjacent agricultural ditch.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in