Engineer updates Moh Views subdivision plan; board flags private-road, fire-access issues

Mar 10, 2025

FCO Engineering presented revised plans for Moh Views (septic placements, grading and a slope analysis) and reported about 1.91 acres of disturbance; the planning board pressed the applicant to resolve private-road upgrades and emergency vehicle access before advancing the subdivision.

The full story

Scott Boltz of FCO Engineering told the Town of Lumberland Planning Board the Moh Views sketch plan now shows septic-system placements, home locations, grading and a slope-analysis, and that the submission estimates 1.91 acres of disturbance. "We have 1.91 Acres of disturbance," Boltz said while outlining erosion-control measures and changes to address slope and flood-boundary concerns.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in