River Ridge CDD approves $3,500 MRI proposal to widen E3 Basin control structure
Summary
The board approved MRI Construction Proposal #606 to widen the E3 Basin control structure to maximize outflow capacity for $3,500 and requested before-and-after photographs and specs; staff will inquire about adding a manual gate.
The River Ridge Community Development District Board unanimously approved MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure for $3,500.
District Engineer Charlie Krebs explained the current control structure is slightly shy of the maximum width on the Florida Power & Light easement and the proposal would use a concrete saw to widen the weir to the maximum width "to get the most water out of the community." Supervisor Kurt Blumenthal moved to approve the proposal; Supervisor Bob Schultz seconded and the motion passed with all in favor.
Krebs said he will provide before-and-after photographs and the project specifications to the board and will inquire about whether a manual open/close gate could also be installed near the control structure. The work is intended to improve drainage outflow and reduce ponding within the community.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
