Commission schedules engineers to study Woodworth–Factory drainage bottleneck after prolonged backups
Jul 7, 2025
Commissioners identified a recurring drainage bottleneck at Woodworth and Factory that led to prolonged manhole backups; engineers will visit next week and the stormwater board will prioritize the area, with funding reported as available for work after design and elevation surveys.
The full story
Commission members described a persistent drainage bottleneck at Woodworth and Factory that left a manhole clogged for hours after heavy rain and contributed to localized flooding. Brian and other members told the Commission they watched crews work for many hours to clear the blockage and said the town has identified the Woodworth/Factory corridor as a top priority for stormwater engineering.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
