State Water Board staff outlines scope and timeline for draft small MS4 permit

Aug 11, 2026

Paul Levy of the State Water Resources Control Board presented the draft reissuance of the statewide small MS4 permit, reviewed major topic areas (trash, TMDLs, post‑construction controls), and set a public comment deadline of Sept. 2, 2026; staff will take a revised draft to the board in 2027.

The full story

Paul Levy, with the municipal stormwater unit at the State Water Resources Control Board, opened the virtual staff workshop and summarized the permit history and schedule. He told attendees the 2013 statewide small MS4 permit was being reissued after an informal draft in 2024 and a formal draft in 2026, and that staff anticipate bringing an updated draft to the board for consideration in 2027 after responding to public comments.

Levy noted logistics for participation and the comment process: oral comments at the upcoming in‑person board workshop (Aug. 19) will be accepted but the board will take no action at that meeting, and written comments are due by noon on Sept. 2, 2026. “If you want a formal response or you want your comments to be formally noted in the record, we ask that you please submit a written comment, or make an oral comment at the board workshop,” he said. The presentation covered new permittees, the six minimum control measures, cost reporting, TMDLs, an alternative stormwater‑capture compliance option, trash implementation requirements, and ASBS/biological‑significance items. Staff recorded the workshop and will post slides and the recording when available.

Written with AI from the event video and transcript. Check it against the source ↓