Township engineer proposes expanded resurfacing and a condition-based maintenance plan
Jan 23, 2025
Engineer recommended resurfacing about 65,000 square yards this year, described a condition-based road-rating system and preventive treatments (chip sealing, crack sealing, micropaving), and proposed a computerized road-rating survey to guide multi-year planning.
The full story
The township engineer presented a preventative, data-driven road maintenance strategy designed to extend pavement life and reduce reconstruction costs. He said the townships objective is to establish a sustainable maintenance program that targets preventive treatments and avoids costly reconstruction. The engineer proposed approximately 65,000 square yards of resurfacing for the year, above the estimated minimum of 46,000 square yards needed to maintain the network.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →