Mayor says pool crack likely non‑structural; RFP responses due for repair work
Apr 6, 2026
Mayor reported inspections of the municipal pool and said contractors believe a visible crack is likely not structural; he recommended draining the pool to make repairs and noted an RFP for the work was due Monday.
The full story
The mayor reported that contractors who inspected the municipal pool believe a crack running across the pool is ‘‘probably not structural’’ and that much of the issue can be addressed once the pool is drained. "They basically I was informed that the crack going across the pool is probably not structural," the mayor said, describing underlayment and weeping where electrical conduit passes through concrete blocks.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →