Wayne County to add engineering inspection services for Racko Road bridge replacement
Aug 12, 2026
The committee reviewed an amendment to add construction/post-construction inspection services by Sea Orba Group for the Racko Road bridge replacement over Blickby Drain; staff confirmed the procurement went to MDOT‑prequalified firms and commissioners requested solicitation and bid-count details for transparency.
The full story
The committee considered an amendment to a three-year engineering contract to add construction and post-construction inspection services for the Racko Road bridge replacement over Blickby Drain in Brownstown Township. Assistant Division Director of Engineering said the package was issued to MDOT-prequalified firms and that Sea Orba Group (the recommended firm) has worked with the county previously.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →