Board approves $3,500 for E3 basin control-structure widening to improve outflow

Mar 24, 2026

The Board approved MRI Construction Proposal #606, authorizing a concrete saw widening of the E3 Basin control-structure weir to maximize outflow toward the FPL easement for $3,500; the engineer will produce before-and-after photos and inquire about adding a manual gate.

The full story

Mrs. Cleo Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure. Charlie Krebs said the current control structure outfall toward the Florida Power & Light easement is slightly narrower than the maximum, and MRI would use a concrete saw to widen the weir to the maximum width to improve water flow.

On motion by Kurt Blumenthal and seconded by Bob Schultz, with all in favor, the Board approved MRI Construction Proposal #606 in the amount of $3,500. Krebs will provide before‑and‑after photographs of the control‑structure widening project, forward project details and specifications to the Board, and inquire about installing a manual open/close gate near the control structure.

Written with AI from the event video and transcript. Check it against the source ↓