Board approves $3,500 for E3 basin control-structure widening to improve outflow
Mar 24, 2026
The Board approved MRI Construction Proposal #606, authorizing a concrete saw widening of the E3 Basin control-structure weir to maximize outflow toward the FPL easement for $3,500; the engineer will produce before-and-after photos and inquire about adding a manual gate.
The full story
Mrs. Cleo Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure. Charlie Krebs said the current control structure outfall toward the Florida Power & Light easement is slightly narrower than the maximum, and MRI would use a concrete saw to widen the weir to the maximum width to improve water flow.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →