Engineer: grading and wet ponds designed to keep Terrace Farm post‑development flows at or below current levels
May 12, 2026
May 12, 2026
Choice One Engineering told council the preliminary plan for Terrace Farm uses wet ponds and grading to raise lots out of the 100‑year floodplain and limit post‑development discharge; residents said they remain concerned about basements and prolonged heavy‑rain events.
The full story
Choice One Engineering told Inglewood City Council on May 12 that the Terrace Farm concept relies on stormwater ponds and grading to ensure the subdivision does not increase downstream flows.
