Center Township roadmaster details low-cost bridge fixes, culvert upsizing

Sep 29, 2026

Center Township roadmaster Colin Reynolds described replacing a 23-foot single-lane metal bridge with a 23-foot aluminum arch culvert to create a double-lane road with no weight limit and recounted upsizing a 48-inch culvert to 60 inches as a practical alternative to conventional bridge funding.

The full story

Colin Reynolds, supervisor and roadmaster for Center Township, described locally implemented alternatives to conventional bridge replacement, citing a recent project where a 23-foot single-lane metal bridge was replaced with an aluminum arch culvert to create a double-lane roadway and remove a weight limit.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in