Center Township roadmaster details low-cost bridge fixes, culvert upsizing
Sep 29, 2026
Center Township roadmaster Colin Reynolds described replacing a 23-foot single-lane metal bridge with a 23-foot aluminum arch culvert to create a double-lane road with no weight limit and recounted upsizing a 48-inch culvert to 60 inches as a practical alternative to conventional bridge funding.
The full story
Colin Reynolds, supervisor and roadmaster for Center Township, described locally implemented alternatives to conventional bridge replacement, citing a recent project where a 23-foot single-lane metal bridge was replaced with an aluminum arch culvert to create a double-lane roadway and remove a weight limit.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →