Selectmen authorize boring test for Old Kingfield Road engineering work

Dec 3, 2025

Road Commissioner Pat Mitchell presented two engineering quotes for Old Kingfield Road; the board authorized a subsurface boring test and directed that the road be open only to local traffic during testing.

The full story

Pat Mitchell, New Portland’s Road Commissioner, told the board he has obtained two engineering quotes for work on Old Kingfield Road and recommended further subsurface investigation. The board authorized Mitchell to proceed with a boring test to gather data needed for engineering decisions.