Board approves $65,000 cleaning contract and $5,800 rip-rap installation with MRI Inspection LLC

May 26, 2026

MRI Inspection LLC presented proposals for diver-led cleaning of structures with 25%+ blockage and rip-rap installation in CB-130; the board approved MRI Estimate #6583 for $65,000 and Estimate #6604 for $5,800.

The full story

Brenda Radford of MRI Inspection LLC presented an inspection report and two proposals: a diver-based cleaning for structures with blockage of 25% or higher and rip-rap installation in CB-130. "The proposal is to use divers to clean structures with blockage of 25% and higher," Radford said.

On motions brought before the board, supervisors approved MRI Estimate #6583 for cleaning in the amount of $65,000 and MRI Estimate #6604 for rip-rap installation in CB-130 in the amount of $5,800. The board corrected a location reference (work will be in CB-130, not CB-139) before approving the rip-rap contract.