Commission approves $3,732 dock replacement at County Lake
May 11, 2026
May 11, 2026
Parks staff reported an Easy Dock section was damaged and not repairable; the board authorized a $3,732 replacement from the capital outlay line to restore the public dock before summer.
The full story
Parks manager Isaac (S9) told the board a section of the public Easy Dock had been damaged — likely by a boat — and could not be repaired under warranty. He said the vendor quoted $3,732 for the replacement float and freight to the lake.
