Board authorizes survey for County Road A sewer main replacement after engineering briefing
Jun 10, 2026
Delta 3 Engineering presented a plan to replace a failing sewer main along County Road A, citing sinkhole activity and a blocked televising attempt; the board authorized a survey to align design with the county road project and explore financing options.
The full story
Delta 3 Engineering's Mark Digman told the Village Board the timing for replacing the sewer main on County Road A is favorable because the county plans to reconstruct the roadway. Digman cited a sinkhole opening on 1st Street and a failed televising attempt under State Highway 35 that was blocked by water as evidence of a compromised pipe section. He presented a preliminary alignment designed to reduce costs by routing most pipe outside the roadway and minimizing manholes.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →