Board presses wind developers on noise, ADLS performance and enforcement options
Jun 9, 2026
Commissioners reviewed CUP requirements for wind projects, raised repeated complaints about aircraft-detection lighting and noise, and asked counsel to draft enforcement notices with time-limited remediation and potential fines or litigation if compliance is not achieved.
The full story
Marion County commissioners spent an extended portion of the June 8 meeting reviewing wind-energy compliance tied to existing conditional-use permits. Staff recapped the CUP requirements set in 2019 for the Sunflower Energy Center: modeled and measured noise thresholds (55 dBA at nonparticipating property lines; 50 dBA at nonparticipating residences), requirements for third-party sound studies within 0.5 miles of turbines, and aviation-lighting conditions that permit aircraft-detection lighting systems (ADLS) only if FAA-authorized.
