Board approves $3,500 MRI proposal to widen E3 Basin control structure weir

Mar 24, 2026

The River Ridge CDD approved MRI Construction Proposal #606 to widen the E3 Basin control structure weir to maximize outflow; the board unanimously approved the $3,500 proposal and asked the engineer to provide before-and-after photos and explore a manual gate option.

The full story

Mrs. Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure, explaining the existing weir is slightly shy of the maximum width. Charlie Krebs said MRI would use a concrete saw to widen the weir to the maximum to improve outflow toward the Florida Power & Light easement and that the board could consider installing a manual open/close gate nearby.

On motion by Supervisor Kurt Blumenthal and seconded by Chair Bob Schultz, the board unanimously approved Proposal #606 in the amount of $3,500. Krebs agreed to provide before-and-after photographs of the control-structure modification and said he will inquire about installing a manual gate near the structure.

Written with AI from the event video and transcript. Check it against the source ↓