Applicant seeks buffer reduction in PD modification; hearing examines 'existing' 5‑ft buffer vs. 20‑ft requirement

Jul 20, 2026

A major modification to an existing PD proposed reducing a 20‑foot Type B buffer to a 5‑foot existing buffer along a southern boundary; county staff and the hearing master pressed the applicant to explain why the 2019 approval's buffer was not installed and whether the reduced buffer is supportable for Option A (no redevelopment) versus Option B (redevelopment).

The full story

Nicole McInnis, presenting a major modification to PD19‑1421, described two options: Option A would retain existing buildings and site layout while Option B would allow redevelopment with updated site improvements. The applicant seeks a variation to maintain an existing 5‑foot southern buffer in lieu of the 20‑foot Type B buffer required under the 2019 PD conditions. McInnis said the site contains buildings constructed before 2019 and that the 5‑foot buffer derives from an earlier site plan "built under a previous code."

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in