Staff calls repeated pump failures at RAS/WAS station a persistent problem; manufacturer inspection underway

Sep 9, 2026

Staff reported multiple pump failures at the RAS/WAS station, saying the most recent unit was sent to the manufacturer for inspection and that engineers are being consulted to determine if a design or installation flaw is to blame.

The full story

A staff member told the council the RAS/WAS pump station has experienced repeated, destructive pump failures. The staff member said the failed pump was sent to the manufacturer (Grama Fosse) for inspection and that engineers who designed the station are being asked to review whether a design or installation problem exists. "This pump went to their manufacturer, went to Grama Fosse to have it inspected ... this is literally the 5th pump that's been in there," the staff member said.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in