County staff describe failed tile and drainage fixes; commissioners consider repair authorization

Jun 29, 2026

Staff described a failed 30-inch tile installation under a railroad crossing that allowed surface water to infiltrate and erode stone bedding; recommendations included mortaring gaps, installing an 8-inch dual-wall tile, and using debris cages. Commissioners discussed potential lane work and a motion to move drainage at a specific address.

The full story

A county staff member (S3) reported on a drainage problem where a 30-inch tile installed inside a 36-inch casing has deflected about three-quarters of an inch, creating a gap that allows water to penetrate and erode surrounding stone bedding. S3 described visible seepage, holes where water was surfacing and the presence of a perforated pipe: "What I believe happened is when the 30 inch tile was installed into 36 inch casing... it created just a slight gap at the very top where that casing and that pipe went," S3 said, and outlined steps the crew took to mortared and fabric-seal the gap.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in