Committee flags $230,400 subsurface ledge cost after site testing
Sep 16, 2026
Sep 16, 2026
Presenter told the committee the site encountered a second ledge; PCO number 3 was presented for roughly $230,400. Committee members requested documentation and said the subcommittee had reviewed testing and surveying prior to bringing the PCO forward.
The full story
The presenter told the committee that the project team found a second ledge during excavation and that PCO number 3 covers remediation of that subsurface condition. The presenter said the team documented the ledge with surveying and testing and that the subcommittee had reviewed the evidence before bringing the PCO to the committee.
