Town reports improved sludge processing, seeks volunteers for lateral testing amid copper-corrosion study
Aug 28, 2026
The water and sewer committee reported better sludge-dryer and gravity-thickener performance (reducing landfill loads), plans for lagoon cleanup and well redevelopment, results from a copper corrosion-control study and a volunteer lateral service-line testing program to comply with EPA rules; the board also appointed a new chief wastewater operator and awarded an engineering contract for a Rosendale Road water-main project.
The full story
The water, sewer, engineering and environment committee told the board it has seen measurable operational improvements at the wastewater treatment plant: the sludge dryer and a gravity belt thickener are performing better, reducing the number of landfill loads and saving about $1,500 per avoided load, according to the committee report.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →