Jerónimo Trail bridge likely to be removed; temporary access options under review
Aug 11, 2026
Public Works reported the bridge at Jerónimo Trail will likely be taken out and a temporary roadway built after border-related access is no longer available; staff will return with design and funding options.
The full story
Jason Fosseo told the board that the Jerónimo Trail guardrail and nearby bridge are in a compromised state; temporary chain-link fencing was installed earlier and emergency fixes were implemented to protect a residence below the site. He said options under consideration include rebuilding the bridge, installing a low-water crossing or collapsing the existing structure and creating a temporary driving surface to restore access.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →