Council authorizes $47,380 in electrical work and arc‑flash study for Neff Road pump station

Mar 16, 2026

Council approved emergency electrical contact cleaning ($18,400) and an arc‑flash study ($28,980) with Rotor Electric for the Neff Road pump station to address NFPA 70E and Michigan OSHA compliance and reduce safety risk, with total estimated cost $47,380 to be paid from the Pump Station Maintenance Budget.

The full story

City Manager Valentine told the Council that the Neff Road Pump Station lacked a documented arc‑flash study and required NFPA 70E labeling and maintenance; hydrogen sulfide in the station atmosphere can accelerate corrosion and increase fire hazard risk. Staff solicited proposals and presented three responses: Turner Electric (cleaning $20,464; study $29,238), Rotor Electric (cleaning $18,400 including DTE coordination; study $28,980), and Ferndale Electric (unable to provide a proposal for scope). Rotor Electric's proposals included coordination with DTE to fully disconnect the 4,800‑volt incoming lines for safe cleaning.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in