Developer seeks variance to increase impervious area at M&M Car Care; plan includes detention pond
Aug 5, 2026
M&M Car Care requested three variances tied to stormwater, including raising impervious coverage to about 88% (vs. an 80% maximum), while proposing a full detention pond to offset increased runoff and bypass detention on a 0.22‑acre northern portion.
The full story
Josh, representing DVG and M&M Car Care, presented a variance package for redevelopment across from the Burger King. The proposal includes three development variances related to stormwater: an increase in impervious surface to roughly 88% (the code maximum cited at the meeting was 80%), construction of a full detention pond to manage added runoff, and allowing the northern 0.22‑acre portion of the lot to discharge to the public system rather than being detained due to site constraints.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →