Board approves solid-waste purchases, engineering contract and equipment for transfer station

Apr 22, 2026

The board authorized Barr Engineering professional services ($17,500, year corrected to 2026) and approved purchases including a $7,416 Bobcat power-broom attachment and two 30-yard roll-off containers for $15,200 total (Metal Works low bid). All items were budgeted and approved by voice votes.

The full story

Solid waste staff asked the board to authorize several budgeted purchases and a professional-services contract in support of the county’s new transfer station and recycling operations. Staff recommended authorizing Barr Engineering to perform annual groundwater-quality review services for $17,500 (staff noted the background incorrectly listed the year and said it should read 2026). "It is our recommendation to go ahead and authorize a solid waste director to sign the proposal with Barr Engineering for professional services for $17,500," the director said.

The board also approved two equipment purchases discussed at the solid-waste committee: a Bobcat power-broom attachment (state bid through FarmRite) for $7,416 to improve tipping-floor cleaning and snow removal, and two 30-yard roll-off containers to replace worn inventory (Metal Works low bid at $7,600 each, $15,200 total). Staff described these as budgeted items and the board approved them by voice vote.

Written with AI from the event video and transcript. Check it against the source ↓