Logan County approves temporary Genesis Wind MET tower with FAA and setback conditions
Aug 4, 2026
The Board approved Special Use Permit #244 for Genesis Wind, LLC to install a temporary meteorological tower with conditions including a minimum 263-foot setback from county right-of-way, maximum height capped at 263 feet, guyed structure with sidelights and a top flashing beacon per FAA requirements, underground power and fiber, and a communications box at the tower base. Vote 3-0.
The full story
The Logan County Board of Commissioners approved Resolution 2026-26 to grant a Special Use Permit (SUP #244) to Genesis Wind, LLC (a Saga Energy subsidiary) for one temporary meteorological (MET) tower in the Southwest Quarter of Section 24, Township 12 North, Range 52 West. Commissioner Jim Santomaso moved approval and Commissioner Yahn seconded; the motion carried 3-0.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →