DPW reports hydrant training, water-line replacement and wastewater calibration plans
Sep 8, 2025
DPW representative Doug Schnell reported hydrant flushing complete with crew training Sept. 17, 2025; a galvanized service at 1010 St. Helen Street was replaced with PEX; new water/sewer lines started on Ballanger and in the Industrial Park; discharge pump calibration scheduled Sept. 18, 2025 and the wastewater plant serves ~1,000 people but is certified for 3,000.
The full story
Doug Schnell, speaking for the Department of Public Works, told the council that all hydrants have been flushed and a crew training on proper hydrant repairs and operation is scheduled for Sept. 17, 2025. Schnell reported a private service at 1010 St. Helen Street that used galvanized pipe was replaced with PEX and that new water and sewer lines have been started on Ballanger and in the Industrial Park.
