Committee advances decennial groundwater study for control areas
Feb 27, 2026
Feb 27, 2026
Senate File 50, which would require a groundwater study every 10 years in state-designated control areas and funds updated monitoring and mapping, was advanced 9-0 after sponsors and the state engineer cited local development and water-use conflicts in control areas.
The full story
The Joint & Standing agricultural committee unanimously recommended do-pass on Senate File 50 on March 13. The bill would require a new groundwater study every 10 years in control areas designated by the state engineer to assess aquifer recharge, consumption and the effect of corrective controls.
