Springfield to survey PPL parcel for possible cell-lease revenue; board simplifies solar RFP
Sep 23, 2025
The board authorized an engineering cost estimate to survey a PPL-owned parcel to assess leasing space on existing towers for cellular equipment and agreed to issue a simplified request for proposals for a 40 kW solar system at the township building.
The full story
Springfield Township supervisors on Sept. 23 authorized the Township Engineer to obtain a cost estimate for a full survey of a PPL-owned parcel the township is considering acquiring or leasing in order to verify property lines and assess whether two existing towers could host cellular equipment for lease revenue.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →