Panel approves window replacement application with Boral trim
Jan 21, 2026
Jan 21, 2026
A local design-review panel voted to approve an application to replace multiple second-story windows and install new casing made of Boral to match existing profiles; the approval included condition notes on sill alignment and signage to be reviewed at a follow-up meeting.
The full story
The panel voted to approve an application to replace multiple windows and to install new casing made from Boral to match the profile and dimensions of existing trim. Committee member (S3) moved the approval, and the motion was seconded and carried during the meeting.
