WWTP operator reports generator repair, copper testing and safety fixes
Jun 25, 2026
Jun 25, 2026
WWTP Chief Operator Scott Urban reported an in-house generator repair, copper testing by Pace, RBC train #2 pumping and sludge disposal needs, a quoted roof patch, installation of an eyewash station and plans for annual hoist inspections following a DLS walkthrough.
The full story
Scott Urban, the Town of Warren wastewater treatment plant chief operator, briefed the Board on plant maintenance and safety work during the June 25 meeting.
