VDOT details short‑term safety fixes, speed study and bridge progress in Hanover
Oct 14, 2026
Philip Frazier (VDOT) briefed the board on resurfacing, winter prep, an Elmont–Ashcake intersection fatality review and short‑term fixes (dual stop ahead signs, dual stop signs, reflective pole graphics); Mount Hermon bridge work is nearing completion.
The full story
Philip Frazier, VDOT resident engineer for the Ashland residency, told the board the department is finishing resurfacing and preparing for winter operations, including mobilizing contracted equipment and state forces. He said a fatality at the Elmont–Ashcake intersection prompted a post‑crash review and short‑term measures such as adding dual 'stop ahead' warnings, dual stop signs and reflective graphics on sign poles to improve visibility.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →