VDOT details short‑term safety fixes, speed study and bridge progress in Hanover

Oct 14, 2026

Philip Frazier (VDOT) briefed the board on resurfacing, winter prep, an Elmont–Ashcake intersection fatality review and short‑term fixes (dual stop ahead signs, dual stop signs, reflective pole graphics); Mount Hermon bridge work is nearing completion.

The full story

Philip Frazier, VDOT resident engineer for the Ashland residency, told the board the department is finishing resurfacing and preparing for winter operations, including mobilizing contracted equipment and state forces. He said a fatality at the Elmont–Ashcake intersection prompted a post‑crash review and short‑term measures such as adding dual 'stop ahead' warnings, dual stop signs and reflective graphics on sign poles to improve visibility.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in